A long overdue thread of my experience on the Xiamen BRT, a 67km long fully grade separated BRT that carries over 300,000 people per day and wants to be a metro. pic.twitter.com/QEnQdQJURW
— JR Urbane Network (@JRUrbaneNetwork) August 28, 2024
A long overdue thread of my experience on the Xiamen BRT, a 67km long fully grade separated BRT that carries over 300,000 people per day and wants to be a metro. pic.twitter.com/QEnQdQJURW
— JR Urbane Network (@JRUrbaneNetwork) August 28, 2024
Tags: ev bus conversion
This entry was posted on 30/08/2024, 12:32 am and is filed under General. You can follow any responses to this entry through RSS 2.0. You can leave a response, or trackback from your own site.
Arclite theme by digitalnature | powered by WordPress